1.
Hydration in concrete between??
and?
2.
Something about “fast track
project”
3.
Critical Path
4.
Something about “resource
leveling
5.
Total Slack in the project
which is equivalent to “total float”
6.
Usage of slack in the project
7.
CPM forward and backward
calculation to obtain, slack and critical path??
8.
Project life cycle does not include??
9.
Asphalt bleeding are due to..
10.
Masonry wall strength depends
on....
11.
Area of embankment of 100 000”in strange unit” to filled from
another area with swelling ratio 20 % and shrinkage ratio 15 % calculate the
material required, all equation are given to
give you compacted soil, loose soil
12.
Last
component that is added to cement production process is:
13.
Car going on a speed of 60 mile/Hr on a curve
highway. After passing midpoint the driver saw an accident in front of him. The
distance that will be passed from the moment the driver saw the accident until
he hit the brakes equal to: answer in Feet
14.
In “CCY” culvert
with station 0.00+00 and with elevation
163.666 ft. calculate the back filling above the culvert in feet
15.
Moment method devolve “ name of person”
16.
A question on influence line
to calculate reaction at point ??, given a continues beam with 1 hinge,
2 roller and intermediate hinge
17.
Poisson ratio what is the
relation between “?” and between “?”
18.
Steady air flow in pipe 1 & 2 reducer given is
Velocity, dia and flow rate (Kg /m3) for pipe 1
dia in pipe 2
Calculate the velocity of pipe 2
19.
`Below came 3 times 2 same 1
different numbers