Skip to main content

mmup mechanical questions 06


mmup mechanical questions


1. Car chassis are: Felix, Rigid, stiff?   
2. What is not a System parameter? Pressure, Temp, specific volume, Heat?                                   
3. Reason for Fast track project?. Future material price, cost reduction? 
4. Barometric gage? Atm,  atm & differential. Diff only?
5. Manometer? Differential, atm?
6. Centripole force?
7. Hooks law?
8. Onset plastic deformation? Yield, plastic, rigid
9. Stress and strain? Proportional
10. Forward plan. early start early finish
11.shahida work in inf mgm project, Run by inf mgm dept and helped through normal procedures by other dept. type of org? functional, projectized, .functional matrix....?
12.car dash board from? Polymer,metal?
13. Differential gear. Reducing speed, changing speed, jerk-off free?                                        
14. Water boiling at which point? Critical, saturation..?
15.what to do in a project to issue AFC according to contract?
16. Sustainability?
17. What phase is under shear? Gas, liquid, metal, fluid?
18.software development process?. Plan.do.chk.act
19.material under failure due to excessive plastic deformation due to? material, Design and dimensions.?
20.change matter from state to state? Process, cycle?
21.thermoplast is due to? heat and pressure and get hard.

1.microphone,and amplifier and speaker sketch:  and ask about input and output.
2. When boiling water in pan. What is constant? Pressure, temp?
3. in delay of contract what is the inacceptable excuse?
4.unit of linear acceleration?
5. When u have project split into small parts, what is the name of activities of estimating resource, cost and time?
6. Name of point where 3 points of matter exists.
7. Cause/effect diagram?
8.failure of material because of excessive deflection, .what is the remedies?
9.what is strength of material?
10.why concrete is reinforced with steel?
11.why does structures develops thermal stresses?
12. Variation from spec. called what?
13. For a test case. What name of doc. Includes all req.chk list?
14.p=densityxheightx g. What is p?
15. In a cycle of generator eff.70% and turbine 80%.what is the overall eff.?
16. What does strain hardening to a material? Tougher, stiffer?

Comments

Popular posts from this blog

MMUP registration procedure in 3 Simple Steps

MMUP registration 1) ATTESTATION (EDUCATIONAL CERTIFICATES) Orignal Degree Memo Consolidated Marks Sheet Transcript of Each Semester Marks Bonafide Letter from College/University Medium English /regular student  2) PCC (Police Clearance Certificate)  Get PCC from your Embassy  Then Home country PCC to be attested by Qatar MOFA  Then Open Hunkoomi Account through hukomi website login mme.gov.qa then go to Engineers and Engineers committee, registration of applications  Then Extract a good conduct certificate from the site, print this and take along with your home PCC to  CID office. After one week they will give you Qatar PCC. 3) SUBMISSION OF DOCUMENT login mme.gov.qa then go to Engineers and Engineers committee  Then registration of applications then apply. Upload the documents needed with Personal data. After uploading the documents you will get notification from baladiya to submit original documents. After submitting origi...

mmup project managment questions

mmup project project management 1- Strategy considered to be under purview of senior management is: A) Old school thinking B) A new school of management thought C) Necessary in a company structure D) Beneficial to the Project Manager E) Dependent on company goals 2- Project managers who do not understand the role that their project plays in accomplishing the organization's strategy tend to make all the following mistakes except: A) Focusing on low priority problems B) Overemphasizing technology as an end in and of itself C) Focusing on the immediate customer D) Trying to solve every customer issue E) All the above are likely mistakes 3- Project selection criteria are typically classified as: A) Financial and non-financial B) Short-term and long-term C) Strategic and tactical D) Required and optional E) Cost and schedule 4-The advent of project management has been most profound in A) Automobile manufacturing B) Construction C) Information techno...

mmup civil questions 04

1.        The strength of material is defined as: a)        Ability of material to resist external forces. b)       Ability of material to resist deformation. c)        Ability of material to with stand external loads. d)       None of the above.