1.      Sustainability?
a.      Economic
b.      Environment
c.       Social
d.      All of the above
2.      For Less discharge, high pressure. Which pump is suitable
a.      Centrifugal pump
b.      Axial Pump
c.       Reciprocating pump
3.      Welding: Prevention of oxidizing of molten metal
a.      Filler material
b.      Flux
c.       Coating
4.      Low calorific value.
5.      Smoke detector inspection.
a.      Semiannually
b.      Annually
c.       Monthly
d.      Daily
6.       Control valve inspection in supervisory
a.      Semiannually
b.      Annually
c.       Monthly
d.      Daily
7.      Bernoulli’s principle
a.      Conservation of energy
b.      Steady flow
c.       Viscous flow
d.      Incompressible flow
8.      Last activity in the work breakdown schedule.
9.      Three types of circuits for alarm
10.  Plastic deformation
11.  Best location to construct a exhibition and convention centre
Near airport
Public bus routes area
Busy pedestrian area
12.  In open car parking structure, openings where not uniformly distributed in the opposite side. What is the minimum percentage opening to be provided in the perimeter
5%
15%
30%
More than 40%
13.  Fire damper
14.  In real world, physical quantities are
Continuous
Discrete
None of the above

Comments

Popular posts from this blog

MMUP registration procedure in 3 Simple Steps

MMUP registration 1) ATTESTATION (EDUCATIONAL CERTIFICATES) Orignal Degree Memo Consolidated Marks Sheet Transcript of Each Semester Marks Bonafide Letter from College/University Medium English /regular student  2) PCC (Police Clearance Certificate)  Get PCC from your Embassy  Then Home country PCC to be attested by Qatar MOFA  Then Open Hunkoomi Account through hukomi website login mme.gov.qa then go to Engineers and Engineers committee, registration of applications  Then Extract a good conduct certificate from the site, print this and take along with your home PCC to  CID office. After one week they will give you Qatar PCC. 3) SUBMISSION OF DOCUMENT login mme.gov.qa then go to Engineers and Engineers committee  Then registration of applications then apply. Upload the documents needed with Personal data. After uploading the documents you will get notification from baladiya to submit original documents. After submitting origi...

mmup project managment questions

mmup project project management 1- Strategy considered to be under purview of senior management is: A) Old school thinking B) A new school of management thought C) Necessary in a company structure D) Beneficial to the Project Manager E) Dependent on company goals 2- Project managers who do not understand the role that their project plays in accomplishing the organization's strategy tend to make all the following mistakes except: A) Focusing on low priority problems B) Overemphasizing technology as an end in and of itself C) Focusing on the immediate customer D) Trying to solve every customer issue E) All the above are likely mistakes 3- Project selection criteria are typically classified as: A) Financial and non-financial B) Short-term and long-term C) Strategic and tactical D) Required and optional E) Cost and schedule 4-The advent of project management has been most profound in A) Automobile manufacturing B) Construction C) Information techno...

mmup civil questions 04

1.        The strength of material is defined as: a)        Ability of material to resist external forces. b)       Ability of material to resist deformation. c)        Ability of material to with stand external loads. d)       None of the above.